technologies and methods are selected, such as mixer, flocculation tank, sedimentation tank, filter tank, clear water tank, pump station, water supply network, etc. References to the formulas and empirical data on the design. It includes the calculation of maximum water consumption day and maximum water consumption time
,
the design and calculation of flocculation tank and sedimentation tank of main structures, the layout of water plant and the design and calculation of water plant elevation.
咸阳市某区给水工程设计-10311字.docx