construction, this eia will determine the discharge of "three wastes" and the impact of noise and ecological environment during the construction and operation period of the project through detailed engineering analysis. In the area of surface water, groundwater, noise, such as ecological environment present situation appraisal and the environment impact prediction, on the basis of through wastewater pollution sources, for the project, waste gas pollution, solid waste pollution control measures a
长春市双阳区奢岭河(城区段)综合治理工程项目环境影响评价-9748字.docx