equipment operation. In addition, this project should also try to adopt the process technology with low project investment cost and low noise and solid waste pollution during operation. In view of the above problems, this design plans to adopt AO-MBR process, because this process has the advantages of saving space, long service life, good decontamination effect and less sludge production. This process is also in line with the saving requirements in terms of the overall project cost. The implemen
河北某高校教学区中水处理工程初步设计-9595字.docx